It didn't make suggestions regarding current or new Nationwide Corridor designations. The Countrywide Electric powered Transmission Congestion Review produced in September 2015 seeks to offer specifics of transmission congestion by concentrating on precise indications of transmission constraints and congestion and their penalties. The analyze fo